Room Paint Coverage Calculator
Calculate exactly how much paint you need for a room.
Enter dimensions, number of coats, and ceiling preference to get gallons needed and estimated cost.
The basic math
wall area = 2 × (length + width) × height − doors and windows coverage per gallon ≈ 350 sq ft (one coat, smooth surface) gallons needed = (wall area × number of coats) ÷ 350
Always round up. A 12×15 foot bedroom with 9 ft ceilings, one door, two windows, painted in two coats:
- Wall area: 2 × (12+15) × 9 = 486 sq ft
- Minus 1 × 20 (door) + 2 × 15 (windows) = 436 sq ft net
- Two coats: 872 sq ft of coverage needed
- Gallons: 872 ÷ 350 = 2.49
- Add 10% waste: 3 gallons (always round up)
The 350 sq ft rule is optimistic
Paint cans say “covers 400 sq ft” because that’s the lab number. In reality, with cutting in, roller absorption, drying-too-fast in summer, or stippling over textured drywall, you get closer to 300 to 350 sq ft per gallon. Old plaster, raw drywall, and dark-to-light color changes drink paint at 250 sq ft/gallon. Plan conservatively.
When you need more than two coats
- Dark color over white: usually fine in two coats, but reds and yellows often need three (they’re translucent pigments)
- White over dark: almost always three coats. Use a tinted primer first to cut a coat off
- New drywall: PVA primer + 2 coats of paint
- Glossy surface being painted with flat: prime first or paint will streak
- Smoke or water damage: shellac-based primer (Zinsser BIN), then 2 coats
Real coverage by paint type
| Paint type | Sq ft per gallon (one coat) |
|---|---|
| Standard interior latex (eggshell, satin) | 320 to 380 |
| Premium interior latex | 350 to 400 |
| Flat ceiling paint | 380 to 420 |
| Primer | 250 to 300 |
| Exterior latex | 280 to 320 |
| Stain | 200 to 300 (varies hugely by wood porosity) |
| Spray paint (per 12 oz can) | 15 to 25 sq ft |
Door and window deductions, kept simple
The standard adjustments most contractors use:
- Door: 20 sq ft (covers a 3’ × 6'8" door + trim allowance)
- Window: 15 sq ft (standard 3’ × 5')
- Sliding glass door: 40 sq ft
- Closet door (bi-fold): 12 sq ft
- Built-in bookcase: roughly its face area
Plenty of painters skip deductions on small openings entirely, on the logic that the leftover becomes touch-up paint. Fine on a small job. Not fine on a long wall with four windows in it, where you would be buying a whole extra gallon for nothing.
Why buying the right amount matters more than you think
Paint stores can re-mix a custom colour, but never identically. Tint formulas drift between batches even at the same store. Run out mid-job, buy another gallon a week later, and the new paint can show as a faintly different shade on the wall, which raking afternoon sunlight will find for you. The only real fix at that point is repainting the whole wall.
So buy one gallon more than the number above. Keep the leftover sealed for touch-ups, where it lasts two to five years.
Sample pots, the smartest few dollars in the whole job
Most paint stores sell 8 oz sample pots. Paint a 2×2 ft swatch on the wall, then look at it morning, noon, and night before committing to 3 gallons of a color. Wall paint looks very different from the chip in store lighting. Most professional painters do this routinely; most homeowners skip it and regret it.
Rough price tiers
Approximate US retail, and they move. Enter what your store actually charges.
| Tier | Price per gallon | Examples |
|---|---|---|
| Budget | $20 to $30 | Glidden, Behr Premium Plus |
| Mid | $35 to $55 | Behr Marquee, Sherwin-Williams ProClassic |
| Premium | $55 to $90 | Benjamin Moore Aura, Farrow & Ball Estate |
| Designer | $100+ | Farrow & Ball Modern Emulsion, specialty finishes |
A 3-gallon bedroom job at mid-tier paint costs $105 to $165 plus brushes, rollers, drop cloths, painter’s tape, and primer if needed. Budget another $50 to $100 in supplies if you don’t have them already.
The bigger time sink than you expect
Most people underestimate prep by half. Filling holes, sanding, taping, cleaning, moving furniture, taking off outlet covers: that is typically half the job, and the rolling and cutting in goes faster than any of it. Block out a full weekend for one room rather than a Saturday afternoon, and you will finish on Sunday feeling ahead instead of on Monday feeling behind.
How we build and check this calculator
This calculator runs entirely in your browser, so the numbers you enter stay on your device. The math behind it is written by hand and tested against worked examples and standard references before the page goes live.
SuperGlobalCalculator is independently built and maintained. See how we build and verify our calculators.